GLORIA

GEOMAR Library Ocean Research Information Access

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    Springer
    Environmental management 18 (1994), S. 729-742 
    ISSN: 1432-1009
    Keywords: Analytic hierarchy process ; resource allocation ; linear programming ; Olympic National Park
    Source: Springer Online Journal Archives 1860-2000
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Notes: Abstract Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.
    Type of Medium: Electronic Resource
    Location Call Number Limitation Availability
    BibTip Others were also interested in ...
  • 2
    Electronic Resource
    Electronic Resource
    Springer
    Environmental management 18 (1994), S. 707-727 
    ISSN: 1432-1009
    Keywords: Analytic hierarchy process ; Capital budgeting ; Integer programming ; Multiple objective planning ; National parks ; Resource allocation
    Source: Springer Online Journal Archives 1860-2000
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Notes: Abstract Resource inventory and monitoring (I&M) programs in national parks combine multiple objectives in order to create a plan of action over a finite time horizon. Because all program activities are constrained by time and money, it is critical to plan I&M activities that make the best use of available agency resources. However, multiple objectives complicate a relatively straightforward allocation process. The analytic hierarchy process (AHP) offers a structure for multiobjective decision making so that decision-makers’ preferences can be formally incorporated in seeking potential solutions. Within the AHP, inventory and monitoring program objectives and decision criteria are organized into a hierarchy. Pairwise comparisons among decision elements at any level of the hierarchy provide a ratio scale ranking of those elements. The resulting priority values for all projects are used as each project’s contribution to the value of an overall I&M program. These priorities, along with budget and personnel constraints, are formulated as a zero/one integer programming problem that can be solved to select those projects that produce the best program. An extensive example illustrates how this approach is being applied to I&M projects in national parks in the Pacific Northwest region of the United States. The proposed planning process provides an analytical framework for multicriteria decisionmaking that is rational, consistent, explicit, and defensible.
    Type of Medium: Electronic Resource
    Location Call Number Limitation Availability
    BibTip Others were also interested in ...
  • 3
    Electronic Resource
    Electronic Resource
    Springer
    Landscape ecology 6 (1992), S. 233-238 
    ISSN: 1572-9761
    Keywords: model ; fractals ; landscape ecology ; ecosystem
    Source: Springer Online Journal Archives 1860-2000
    Topics: Biology
    Notes: Abstract Digital elevation model data were used to partition a mountainous landscape (northwestern Montana, USA) into watershed/hillslope terrain units at several different spatial scales. Fractal analysis of the perimeter to area relationships of the resulting partition polygons identified statistical self-similarity across a range of spatial scales (approximately four orders of magnitude in partition area). The fractal dimension was higher for a relatively complex fluvially-dominated terrain than for a structurally simpler glacially-dominated terrain (1.23 vs. 1.02, respectively). The structural self-similarity exhibited by this landscape has direct implications in scaling up ecosystem process models for landscape to regional simulations.
    Type of Medium: Electronic Resource
    Location Call Number Limitation Availability
    BibTip Others were also interested in ...
  • 4
    Electronic Resource
    Electronic Resource
    Springer
    Environmental monitoring and assessment 26 (1993), S. 177-185 
    ISSN: 1573-2959
    Source: Springer Online Journal Archives 1860-2000
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Notes: Abstract Guidelines for the early stages of developing a monitoring program are presented. Jumping right into a monitoring program based on standard protocols and a number of commonly monitored parameters is an attractive idea, but it is unlikely to lead to an intelligent allocation of time and money. Rather, a number of well-defined planning steps must be followed before monitoring is begun: 1. Objectives for the program should be well defined. 2. The attributes to be monitored in order to meet objectives should be listed. 3. Methods of monitoring these attributes should be developed. 4. A pilot study should be conducted to determine spatial and temporal variability of the attributes being monitored and the cost of sampling. 5. The results of the pilot study should be carefully evaluated to determine whether program objectives can be met for an acceptable cost. 6. Objectives, attributes to be monitored, and methods should be revised in accordance with the results of the pilot study.
    Type of Medium: Electronic Resource
    Location Call Number Limitation Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...