Skip to main content
Log in

A case study of resources management planning with multiple objectives and projects

  • Research
  • Published:
Environmental Management Aims and scope Submit manuscript

Abstract

Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  • Forman, E. H. 1987. Relative vs absolute worth.Mathematical Modeling 9(3–5):195–202.

    Article  Google Scholar 

  • Fox, D. G., J. C. Bernabo, and B. Hood. 1987. Guidelines for measuring the physical, chemical, and biological condition of wilderness ecosystems. USDA Forest Service General Technical Report RM-146. Rocky Mountain Research Station, Fort Collins, Colorado.

    Google Scholar 

  • Garton, E. O. 1984. Cost-efficient baseline inventories of research natural areas. Pages 40–45in J. L. Johnson, J. F. Franklin and R. G. Krebill (coord.), Research natural areas: Baseline monitoring and management symposium proceedings. USDA Forest Service Intermountain Research Station, Ogden, Utah.

    Google Scholar 

  • Hinds, W. T. 1984. Towards monitoring of long-term trends in terrestrial ecosystems.Environmental Conservation 11:11–18.

    Article  CAS  Google Scholar 

  • Hirst, S. M. 1983. Ecological and institutional bases for long-term monitoring of fish and wildlife populations. Pages 175–178in J. F. Bell, and T. Atterbury (eds.), Renewable resource inventories for monitoring changes and trends conference proceedings. College of Foresty, Oregon State University, Corvallis, Oregon.

    Google Scholar 

  • Johnson, W. C., and S. P. Bratton. 1978. Biological monitoring in UNESCO biosphere reserves with special reference to the Great Smoky Mountains National Park.Biological Conservation 13:105–115.

    Article  Google Scholar 

  • Jones, B. K. 1986. The inventory and monitoring process. Pages 1–9in A. Y. Cooperrider, R. J. Boyd, and H. R. Stewart (eds.), Inventory and monitoring of wildlife habitat. Bureau of Land Management, Denver, Colorado.

    Google Scholar 

  • Olympic National Park. 1990. Olympic National Park resource management plan. Olympic National Park, Port Angeles, Washington.

    Google Scholar 

  • Saaty, T. L. 1980. The analytic hierarchy process. McGraw-Hill, New York, 287 pp.

    Google Scholar 

  • Schmoldt, D. L., D. L. Peterson, and D. G. Silsbee. 1994. Developing inventory and monitoring programs based on multiple objectives.Environmental Management 18(5):707–727.

    Google Scholar 

  • Silsbee, D. G., and D. L. Peterson. 1991. Designing and implementing comprehensive long-term inventory and monitoring programs for National Park System lands. Natural Resources Report NRR-91/04. National Park Service, Denver, Colorado.

    Google Scholar 

  • Silsbee, D. G., and D. L. Peterson. 1993. Planning for implementation of resource monitoring programs.Environmental Monitoring and Assessment 26:177–185.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Peterson, D.L., Silsbee, D.G. & Schmoldt, D.L. A case study of resources management planning with multiple objectives and projects. Environmental Management 18, 729–742 (1994). https://doi.org/10.1007/BF02394636

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02394636

Key words

Navigation