ISSN:
1752-1688
Source:
Blackwell Publishing Journal Backfiles 1879-2005
Topics:
Architecture, Civil Engineering, Surveying
,
Geography
Notes:
: The parameters of the extreme value type 1 distribution were estimated for 55 annual flood data sets by seven methods. These are the methods of (1) moments, (2) probability weighted moments, (3) mixed moments, (4) maximum likelihood estimation, (5) incomplete means, (6) principle of maximum entropy, and (7) least squares. The method of maximum likelihood estimation was found to be the best and the method of incomplete means the worst. The differences between the methods of principle of maximum entropy, probability weighted moments, moments, and least squares were only minor. The difference between these methods and the method of maximum likelihood was not pronounced.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1111/j.1752-1688.1987.tb00784.x
Permalink