Publication Date:
2022-05-26
Description:
This report describes a series of tests performed at SIO/MPL, Point Lorna the week of
17 November 1997 designed to achieve integration of the Broadband Borehole Seismic
System (BBBSS) in preparation for the OSN Pilot Experiment cruise on RN Thompson
during January 1997. Representatives from all groups were present (see appendix A),
with their respective parts of the system and support equipment.
It was anticipated that these tests would result in the complete integration of the various
components of the borehole seismometer system in preparation for the January cruise.
The system would be assembled and tested following a plan (see appendix C) that would
culminate in the fully integrated borehole seismometer being wet tested off the MPL pier.
Description:
This work is sponsored by the National Science Foundation Grant Nos. OCE 9522114and OCE 9523541
with additional support from Scripps Institute of Oceanography and Woods Hole Oceanographic Institution
Keywords:
Borehole gravimetry
Repository Name:
Woods Hole Open Access Server
Type:
Working Paper