GLORIA

GEOMAR Library Ocean Research Information Access

feed icon rss

Ihre E-Mail wurde erfolgreich gesendet. Bitte prüfen Sie Ihren Maileingang.

Leider ist ein Fehler beim E-Mail-Versand aufgetreten. Bitte versuchen Sie es erneut.

Vorgang fortführen?

Exportieren
  • 1
    Publikationsdatum: 2022-05-25
    Beschreibung: The Seafloor Borehole Array Seismic System (SEABASS) was originally developed to record autonomously on the seafloor the signals received on a four-sonde three-component borehole geophone array in the VLF band (2-50Hz)(Stephen eta!., 1994). The system is designed to use the wireline re-entry capability (Spiess, 1993; Spiess eta!., 1992) to install and retrieve the seafloor instrumentation (Figures 1 and 2). Following the successful demonstration of this technology on the LFASE (Low Frequency Acoustic-Seismic Experiment) project in September 1989, it was decided to extend the capability to broadband (1000sec-5Hz) borehole seismometers which could be used for permanent seafloor seismic observatories in the Ocean Seismic Network (Orcutt and Stephen, 1993; Purdy and Dziewonski, 1988; Purdy and Orcutt, 1995; Stephen, 1995; Sutton and Barstow, 1990; Sutton eta!., 1988; Sutton eta!., 1965). The Broadband Borehole Seismic System (B3S2) is the prototype system for permanent broadband borehole seismic observatories on the seafloor. It has three major components: i) a broadband borehole seismometer, the Teledyne 54000, modified for seafloor operations by Scripps-IGPP; ii) the re-entry system provided by Scripps-MPL; and iii) the seafloor recording system developed by WHO I. Because of the similarity of the seafloor recording system to SEABASS we have named this new system SEABASS-ll. This report discusses the development of SEABASS-Il at WHOI in the period from July 14, 1992 to January 31, 1996. The motivation for the project and a work statement are contained in WHOI proposals 7016 and 7016.1. This report is a collection of documentation prepared while the work was being carried out. Some of the issues discussed in early memos were subsequently changed. Modifications and further testing of SEABASS-ll, as well as final system integration tests with the borehole andreentry systems (both of which are also still being modified and tested) have still to be carried out in preparation for the OSN Pilot Experiment Cruise in Spring 1997. This is a preliminary report only and presents work in progress. It will be useful to the engineering team as a historical reference of the sequence of events in the development of SEABASS-ll but it should not be considered as a technical manual for the instrumentation.
    Schlagwort(e): Seismology ; Borehole gravimetry ; Ocean bottom ; Oceanographic instruments
    Repository-Name: Woods Hole Open Access Server
    Materialart: Working Paper
    Standort Signatur Einschränkungen Verfügbarkeit
    BibTip Andere fanden auch interessant ...
Schließen ⊗
Diese Webseite nutzt Cookies und das Analyse-Tool Matomo. Weitere Informationen finden Sie hier...