ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
The specification and the layout of the booster synchrotron for SPring-8 were decided. The synchrotron is designed to accelerate electron or positron beams from 1 to 8 GeV with a repetition cycle of 1 Hz. The construction of the synchrotron was started in 1993. First, one bending, one quadrupole, and one sextupole magnet were made and the results of the magnetic field measurement were acquired. Two septum, one bump, and one kicker magnets for the beam extraction have been made, the field measurement and a few improvements have progressed. The high power test of the first rf cavity was finished successfully. The calibration test of the button position monitor with the signal treatment circuits is advanced now. The residual components of the synchrotron are designed and constructed, and the commissioning of the synchrotron will start in 1996. This paper presents the first measurement of each component. © 1995 American Institute of Physics.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1145771
Permalink