In:
Advanced Materials Research, Trans Tech Publications, Ltd., Vol. 243-249 ( 2011-5), p. 5789-5793
Abstract:
Combined with the geological conditions and the project features, the selection problem of pilot tunnel construction method of Huangzhuang station is solved. Directing at the commonly used method including CD method, CRD method and double side wall pilot tunnel method, FLAC3D numerical calculation method is adapted to analysis and predict the ground surface deformation and supporting structure hand features. Through analyzing the size and law of surface settlement in this section, the feasibility and differences of these methods is concluded and analyzed. And finally an example is given.
Type of Medium:
Online Resource
ISSN:
1662-8985
DOI:
10.4028/www.scientific.net/AMR.243-249
DOI:
10.4028/www.scientific.net/AMR.243-249.5789
Language:
Unknown
Publisher:
Trans Tech Publications, Ltd.
Publication Date:
2011
detail.hit.zdb_id:
2265002-7
Permalink