GLORIA

GEOMAR Library Ocean Research Information Access

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 11
    Online Resource
    Online Resource
    Hindawi Limited ; 2018
    In:  Mathematical Problems in Engineering Vol. 2018 ( 2018-10-30), p. 1-18
    In: Mathematical Problems in Engineering, Hindawi Limited, Vol. 2018 ( 2018-10-30), p. 1-18
    Abstract: The PPP model is a Public-Private Partnership and a pattern which provides product or service to the public; applying the PPP model to the shale gas development project helps to solve the difficult problem that exists in the shale gas project. Through extensive literature analysis and in-depth study of shale gas PPP projects, for performance evaluation of shale gas PPP project, based on the five dimensions of macroenvironmental characteristics, economic benefits, the project internal processes, innovation and environmental protection and sustainable development, and stakeholder satisfaction, an indicator system consisting of 22 secondary indicators was set up, and the weight of each index was determined by AHP, using the matter element analysis method to build the comprehensive evaluation of the shale gas PPP project performance evaluation model and set indicator evaluation standard of excellent, good, medium, general, and poor in five grades. We evaluate the performance of a shale gas PPP project and conclude that the evaluation grades of the project are good, which is in line with the reality, indicating that the evaluation system and the method are effective and credible.
    Type of Medium: Online Resource
    ISSN: 1024-123X , 1563-5147
    Language: English
    Publisher: Hindawi Limited
    Publication Date: 2018
    detail.hit.zdb_id: 2014442-8
    SSG: 11
    Location Call Number Limitation Availability
    BibTip Others were also interested in ...
  • 12
    Online Resource
    Online Resource
    Hindawi Limited ; 2019
    In:  Mathematical Problems in Engineering Vol. 2019 ( 2019-07-18), p. 1-20
    In: Mathematical Problems in Engineering, Hindawi Limited, Vol. 2019 ( 2019-07-18), p. 1-20
    Abstract: With the large-scale construction of urban rail transit, it will lead to the intersection and transfer of various lines, resulting in more transfer stations. The transfer station is a collection point for multiple subway lines, which is difficult to construct and has a high construction risk. The construction of the new subway station and the operation of the existing subway station are mutually influenced during the close-attached undercrossing construction. Considering the two objectives of ensuring the smooth operation of the existing subway station and the safe construction of the new subway station, this paper comprehensively analyzes the possible safety risk factors during the construction of the new subway station close-attached undercrossing the existing operating station and identifies 75 preliminary risk factors by means of literature review and on-site investigation. Then the Delphi Method and Entropy Weight Method are used to screen the preliminary risk factors, and the main risk factors with greater influence are retained, so that 49 key risk factors are obtained. According to the list of key risk factors, a safety risk assessment index system including 2 first-level indexes, 12 second-level indexes, and 49 third-level indexes is established. Based on the index system, this paper establishes a safety risk assessment model by using Analytic Hierarchy Process (AHP) and Fuzzy Matter Element Method (FMEM). The model first calculates the weight of each index by using AHP, calculates the comprehensive correlation degree of each index by using FMEM, classifies the risk grade of each index according to the comprehensive correlation degree, and determines the risk grade of the project. Finally, the safety risk assessment model is applied to the Dongdalu Station project of Chengdu Rail Transit Line 8. The result shows that the risk grade of this project is moderate risk, which is basically consistent with the actual situation, indicating that the model has good practicability. In this paper, a new safety risk assessment model for subway close-attached undercrossing construction is proposed, which fills the gap in the field of safety risk assessment for the construction of the new subway station close-attached undercrossing the existing operating station.
    Type of Medium: Online Resource
    ISSN: 1024-123X , 1563-5147
    Language: English
    Publisher: Hindawi Limited
    Publication Date: 2019
    detail.hit.zdb_id: 2014442-8
    SSG: 11
    Location Call Number Limitation Availability
    BibTip Others were also interested in ...
  • 13
    Online Resource
    Online Resource
    American Society of Civil Engineers (ASCE) ; 2022
    In:  Journal of Urban Planning and Development Vol. 148, No. 4 ( 2022-12)
    In: Journal of Urban Planning and Development, American Society of Civil Engineers (ASCE), Vol. 148, No. 4 ( 2022-12)
    Type of Medium: Online Resource
    ISSN: 0733-9488 , 1943-5444
    Language: English
    Publisher: American Society of Civil Engineers (ASCE)
    Publication Date: 2022
    detail.hit.zdb_id: 2004014-3
    Location Call Number Limitation Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...