In:
Advanced Materials Research, Trans Tech Publications, Ltd., Vol. 488-489 ( 2012-3), p. 1076-1081
Abstract:
We have used Groundwater Modeling System (GMS) to numerical simulate the groundwater pollution migration caused by crude oil leak in the research regions. The result of the numerical simulation shows those 40 years after the crude oil leak, the contaminative area of pollutant reaches 46595 m3, and then the pollutant doesn’t arrive the pumping well. The density of the pollutants is less than 0.01mg/L. Therefore, we suggest that pipeline projects should make a specific effective plan for groundwater environmental monitoring for the sake of providing reference to institute relative countermeasure for prevention and control groundwater pollution.
Type of Medium:
Online Resource
ISSN:
1662-8985
DOI:
10.4028/www.scientific.net/AMR.488-489
DOI:
10.4028/www.scientific.net/AMR.488-489.1076
Language:
Unknown
Publisher:
Trans Tech Publications, Ltd.
Publication Date:
2012
detail.hit.zdb_id:
2265002-7
Permalink