In:
Applied Mechanics and Materials, Trans Tech Publications, Ltd., Vol. 467 ( 2013-12), p. 277-281
Abstract:
According to Chinese traditional classification, large-sized jackets weight over 10,000 tons and stand in over 100-meter water. Large-sized jackets are different from the normal in construction tonnage, structural dimension and quality control requirements as well as construction difficulty. More complicated construction technology and programme, higher grade of materials, stricter control requirements on node weld and higher risks all need matched stricter, more meticulous and more comprehensive management in planning and scheduling. Combined with construction of LW3-1 deep-water jacket, this paper describes the planning, tracking progress, process control and optimization.
Type of Medium:
Online Resource
ISSN:
1662-7482
DOI:
10.4028/www.scientific.net/AMM.467
DOI:
10.4028/www.scientific.net/AMM.467.277
Language:
Unknown
Publisher:
Trans Tech Publications, Ltd.
Publication Date:
2013
detail.hit.zdb_id:
2251882-4
Permalink