In:
Advanced Materials Research, Trans Tech Publications, Ltd., Vol. 716 ( 2013-7), p. 537-541
Abstract:
There are six key points, such as steel truss column, hoisting frame, hoisting point, wire rope, wire rope connecting in the hoisting system which we construct the COMAC ministry of installed plant. This timely monitoring of several key points in the promotion process is to enhance the process controlled several indicators. For different key points used different monitoring methods for monitoring. The results showed that 6 monitoring method is reasonable, feasible. This method can provide some experiences to the construction and fabrication of the steel member of the project.
Type of Medium:
Online Resource
ISSN:
1662-8985
DOI:
10.4028/www.scientific.net/AMR.716
DOI:
10.4028/www.scientific.net/AMR.716.537
Language:
Unknown
Publisher:
Trans Tech Publications, Ltd.
Publication Date:
2013
detail.hit.zdb_id:
2265002-7
Permalink