In:
Journal of Physics: Conference Series, IOP Publishing, Vol. 2083, No. 4 ( 2021-11-01), p. 042066-
Abstract:
This article combines the actual situation of the coal preparation plant and uses big data cloud technology to carry out detailed system requirements analysis and monitoring platform design. The entire design includes server framework design, database design, cloud service deployment and mobile client prototype design. According to the on-site working conditions of electromechanical equipment, the article uses ER model and 3NF method to abstract it and establishes a MySQL real-time database of equipment operating status. Finally, the ECS cloud server is used to complete the deployment, and the JSP technology is used to realize the display of the system’s man-machine interface, as well as remote monitoring services for equipment monitoring, information management, and user management. Practical application shows that the system can improve the comprehensive automation and information level of the enterprise, reduce the operating cost of the enterprise, and improve the production efficiency of the enterprise.
Type of Medium:
Online Resource
ISSN:
1742-6588
,
1742-6596
DOI:
10.1088/1742-6596/2083/4/042066
Language:
Unknown
Publisher:
IOP Publishing
Publication Date:
2021
detail.hit.zdb_id:
2166409-2
Permalink