GLORIA

GEOMAR Library Ocean Research Information Access

Ihre E-Mail wurde erfolgreich gesendet. Bitte prüfen Sie Ihren Maileingang.

Leider ist ein Fehler beim E-Mail-Versand aufgetreten. Bitte versuchen Sie es erneut.

Vorgang fortführen?

Exportieren
Filter
  • SAGE Publications  (1)
  • Hong, Won-Hwa  (1)
Materialart
Verlag/Herausgeber
  • SAGE Publications  (1)
Person/Organisation
Sprache
Erscheinungszeitraum
  • 1
    Online-Ressource
    Online-Ressource
    SAGE Publications ; 2017
    In:  Waste Management & Research: The Journal for a Sustainable Circular Economy Vol. 35, No. 12 ( 2017-12), p. 1285-1295
    In: Waste Management & Research: The Journal for a Sustainable Circular Economy, SAGE Publications, Vol. 35, No. 12 ( 2017-12), p. 1285-1295
    Kurzfassung: Most existing studies on demolition waste (DW) quantification do not have an official standard to estimate the amount and type of DW. Therefore, there are limitations in the existing literature for estimating DW with a consistent classification system. Building information modeling (BIM) is a technology that can generate and manage all the information required during the life cycle of a building, from design to demolition. Nevertheless, there has been a lack of research regarding its application to the demolition stage of a building. For an effective waste management plan, the estimation of the type and volume of DW should begin from the building design stage. However, the lack of tools hinders an early estimation. This study proposes a BIM-based framework that estimates DW in the early design stages, to achieve an effective and streamlined planning, processing, and management. Specifically, the input of construction materials in the Korean construction classification system and those in the BIM library were matched. Based on this matching integration, the estimates of DW by type were calculated by applying the weight/unit volume factors and the rates of DW volume change. To verify the framework, its operation was demonstrated by means of an actual BIM modeling and by comparing its results with those available in the literature. This study is expected to contribute not only to the estimation of DW at the building level, but also to the automated estimation of DW at the district level.
    Materialart: Online-Ressource
    ISSN: 0734-242X , 1096-3669
    Sprache: Englisch
    Verlag: SAGE Publications
    Publikationsdatum: 2017
    ZDB Id: 1480483-9
    ZDB Id: 46937-3
    Standort Signatur Einschränkungen Verfügbarkeit
    BibTip Andere fanden auch interessant ...
Schließen ⊗
Diese Webseite nutzt Cookies und das Analyse-Tool Matomo. Weitere Informationen finden Sie hier...